Still no brother, so we (im)patiently wait. I'm physically MORE than ready for the big birthday... I've been pretty uncomfortable for about a month now, and though you're never
truly ready to bring life into this world, I'm as ready as I can be.
I went to the doctor this week, and I continue to progress, and the baby continues to drop. I seriously been like I'm wearing him around my ankles right now, which is evident by my old lady shuffle/walk. Funny thing - apparently, I've had the wrong due date this entire time. When I was in the doctor's office on Wednesday, the doctors say, "So, next Wednesday is the big day!" Perplexed, I asked her what she meant by that. Her very confused reply was, "Your DUE date??" I calmly said, "No, my due date is next Saturday (3/8, not 3/5)." Anyway, after much deliberation, it turns out the doctor is correct. Yet another piece of evidence that this is my second child;)
So, since we don't have baby pics to share quite yet, I thought I'd give a brief update on the house progress before I'm unable to consistently stalk our house every few days. We're hoping to close in about a month, and then we have some work we're doing in the house pre-move. Our tentative move date is April 18, and we can hardly wait.
 |
Sidewalk from the back alley to our front door (on the right side). |
 |
Courtyard entry/front door. The giant wall on the left will be stuccoed so that it no longer looks like a prison wall. The courtyard will be landscaped as well so that it doesn't look like a holding cell. A gate will be installed where Eleanor is standing. |
 |
Soon to be pool decking on the left. |
 |
Side view of the house and future home of the pool. The living room/covered patio is on the left and windows to the office/guest bedroom on the lower right. |
 |
View from covered patio - living room, then dining room, then kitchen. |
 |
Deck off kitchen/dining area for grilling. Connects to back alley and side yard/pool. |
 |
Sliding doors to dining room/kitchen. |
 |
Moroccan backsplash tile. Pretty bold, but the grout and appliances will soften it a bit. |
 |
Future home of range and vent hood. |
 |
Hardwood floors on stairs and 2nd story of the house. |
 |
Plumbing fixtures now in. |
 |
Eleanor exclaiming, "Cheers, this is Ellie's closet!" |
The house looks amazing!! We also impatiently wait, although I think the near constant barrage of emails/texts/calls compounds the difficulty of waiting! C'mon baby boy!